Integrated Solutions for Modernizing Railway Infrastructure
The Oradea railway line rehabilitation project, carried out by CFR S.A., is one of the most important investments in Romania’s railway infrastructure. With a total length of 166.44 km, of which Lots 1 and 2 account for 66.94 km, the project aims to electrify the line and modernize both the infrastructure and superstructure to allow […]
Water Management in Aquaculture Industry, Iceland

Integrated Solutions for Sustainable Atlantic Salmon Production The project aimed to develop a high-performance aquaculture infrastructure in a closed system, capable of supporting the annual production of 36,000 tons of antibiotic-free Atlantic salmon. This investment represents a major step toward a sustainable food industry that meets the strictest environmental and food safety standards. The Need […]
Irrigation Network Development – Hungary
Irrigation Network Development – Giurgiu, Romania
Villar Logistics Parks, Romania
Firefighting Ring Main Installation – Sibiu Station
VGP Sibiu Logistics Center
CTP BUW 27 Logistics Warehouse
Rehabilitation of the Oradea railway line

Integrated solutions for modernizing railway infrastructure The Oradea railway line rehabilitation project, carried out by CFR S.A., is one of the most important investments in Romania’s railway infrastructure. With a total length of 166.44 km, of which lots 1 and 2 total 66.94 km, the project aims to electrify the line and modernize the infrastructure […]
Sewerage network development, Miroslava, Iași