Integrated solutions for modernizing railway infrastructure
Challenges
The project involved complex coordination between multiple companies, strict deadlines, and logistics management for the delivery of materials to the construction site. In addition, certain products required AFER certification, and the production and delivery of prefabricated elements had to be synchronized with the pace of work to avoid delays.
Our involvement
Two companies from the CRH Romania group were involved in this project: TehnoWorld and Elpreco. TehnoWorld ensured the protection and management of utilities by providing drainage and sewerage solutions, while Elpreco contributed to the safety and reliability of the infrastructure by replacing outdated concrete components with modern prefabricated elements.
The solution
TehnoWorld supplied corrugated pipes and fittings of various diameters for high-efficiency drainage, as well as corrugated pipes for sewerage systems, chosen for their durability and ease of installation. Elpreco supplied prefabricated concrete manholes, essential for the structural integrity and longevity of the drainage system, as well as prefabricated elements for railway platforms. All products complied with technical requirements and environmental standards, and deliveries were made according to schedule, ensuring continuity of work.